MISO queue ID E0014

Franklin Farms (E0014) was listed in the MISO interconnection queue at the end of 2025 as a 1,640 MW gas project in Richland Parish, LA, according to Berkeley Lab’s queue data file. The filing names Smalling Substation (new) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 4, 2028.

Queue IDE0014
Project nameFranklin Farms
Status (as published)Active
SubstationSmalling Substation (new)
Point of interconnectionSmalling 230kV Substation (new)
CountyRichland Parish
StateLA
Voltage230 kV
Capacity1,640 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2028-08-04
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Richland Parish, LA: 12 requests in the MISO queue, 5 active totaling 5,670 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEntergy Louisiana, LLC
DeveloperEntergy Louisiana, LLC
ClusterERAS Study Cycle 1
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Done
Queue date2025-08-06
Interconnection agreement date2025-11-19

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first