Franklin Farms
MISO queue ID E0014
Franklin Farms (E0014) was listed in the MISO interconnection queue at the end of 2025 as a 1,640 MW gas project in Richland Parish, LA, according to Berkeley Lab’s queue data file. The filing names Smalling Substation (new) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 4, 2028.
| Queue ID | E0014 |
|---|---|
| Project name | Franklin Farms |
| Status (as published) | Active |
| Substation | Smalling Substation (new) |
| Point of interconnection | Smalling 230kV Substation (new) |
| County | Richland Parish |
| State | LA |
| Voltage | 230 kV |
| Capacity | 1,640 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2028-08-04 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Richland Parish, LA: 12 requests in the MISO queue, 5 active totaling 5,670 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Entergy Louisiana, LLC |
|---|---|
| Developer | Entergy Louisiana, LLC |
| Cluster | ERAS Study Cycle 1 |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Request Status: Done |
| Queue date | 2025-08-06 |
| Interconnection agreement date | 2025-11-19 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.