Substation Scout

Richland Parish, LA interconnection queue

5 active projects totaling 5,670 MW in the MISO queue, plus 7 with terminal status (shown grayed).

5active projects
5,670active MW
12total filed
Queue IDProjectkVMWResourceStatus
E0014 Franklin Farms 230 1,640 Gas Active
E0043 Richland Parish generators 230 1,640 Gas Active
E0044 Richland Parish generators 230 1,640 Gas Active
J3841 Not reported 230 770 Gas Withdrawn
J3842 Not reported 230 770 Gas Withdrawn
J2519 Not reported n/r 600 Solar Active
J3760 Not reported 500 405 Solar Withdrawn
J1995 Not reported 115 180 Solar Withdrawn
J2838 Not reported 115 150 Hybrid Active
J1133 Not reported 115 100 Solar Withdrawn
J919A Not reported 115 100 Solar Withdrawn
J660 Not reported n/r 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →