Richland Parish, LA interconnection queue
5 active projects totaling 5,670 MW in the MISO queue, plus 7 with terminal status (shown grayed).
5active projects
5,670active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| E0014 | Franklin Farms | 230 | 1,640 | Gas | Active |
| E0043 | Richland Parish generators | 230 | 1,640 | Gas | Active |
| E0044 | Richland Parish generators | 230 | 1,640 | Gas | Active |
| J3841 | Not reported | 230 | 770 | Gas | Withdrawn |
| J3842 | Not reported | 230 | 770 | Gas | Withdrawn |
| J2519 | Not reported | n/r | 600 | Solar | Active |
| J3760 | Not reported | 500 | 405 | Solar | Withdrawn |
| J1995 | Not reported | 115 | 180 | Solar | Withdrawn |
| J2838 | Not reported | 115 | 150 | Hybrid | Active |
| J1133 | Not reported | 115 | 100 | Solar | Withdrawn |
| J919A | Not reported | 115 | 100 | Solar | Withdrawn |
| J660 | Not reported | n/r | 50 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.