Substation Scout

Orient Energy Center

MISO queue ID E0002

Orient Energy Center (E0002) was listed in the MISO interconnection queue at the end of 2025 as a 265 MW gas project in Adair County, IA, according to Berkeley Lab’s queue data file. The filing names Northboro-Orient as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2027.

Queue IDE0002
Project nameOrient Energy Center
Status (as published)Active
SubstationNorthboro-Orient
Point of interconnectionNorthboro-Orient 345kV
CountyAdair
StateIA
Voltage345 kV
Capacity265 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Adair, IA: 15 requests in the MISO queue, 8 active totaling 2,181 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMidAmerican Energy Company
DeveloperMidAmerican Energy Company
ClusterERAS Study Cycle 1
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-06
Interconnection agreement date2025-12-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.