Substation Scout

Yellow Medicine, MN interconnection queue

4 active projects totaling 518 MW in the MISO queue, plus 9 with terminal status (shown grayed).

4active projects
518active MW
13total filed
Queue IDProjectkVMWResourceStatus
G823 Not reported 115 300 Wind Withdrawn
J1149 Not reported 230 200 Solar Withdrawn
J2561 Not reported n/r 153 Solar Active
J1371 Not reported 345 150 Wind Withdrawn
J493 Not reported 345 150 Wind Operational
J548 Not reported n/r 150 Solar Withdrawn
J3233 Not reported 115 140 Solar Active
G618 Not reported 115 138 Wind Withdrawn
J624 Not reported n/r 80 Solar Withdrawn
J2550 Not reported n/r 75 Battery Active
G680 Not reported 115 20 Wind Withdrawn
J309 Not reported 69 20 Solar Withdrawn
J623 Not reported n/r 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first