White, AR interconnection queue

4 active projects totaling 395 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4active projects
395active MW
8total filed
Queue IDProjectkVMWResourceStatus
J2854 Not reported 115 150 Hybrid Withdrawn
J1134 Not reported 115 100 Solar Withdrawn
J2133 Not reported 115 100 Hybrid Active
J2742 Not reported 115 100 Solar Active
J3531 Not reported n/r 100 Solar Withdrawn
J893 Not reported 161 100 Solar Operational
J1373 Not reported 115 95 Solar Operational
J653 Not reported n/r 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.