Substation Scout

Wexford, MI interconnection queue

2 active projects totaling 304 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
304active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3723 Not reported 345 300 Solar Active
J3501 Not reported 138 200 Battery Withdrawn
J406 Not reported n/r 4 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first