Webster, KY interconnection queue

3 active projects totaling 460 MW in the MISO queue, plus 4 with terminal status (shown grayed).

3active projects
460active MW
7total filed
Queue IDProjectkVMWResourceStatus
J3089 Not reported n/r 696 Gas Withdrawn
J1901 Not reported n/r 200 Battery Withdrawn
J1619 Not reported 161 160 Solar Active
J1450 Not reported 161 150 Solar Active
S1073 Surplus; J1450 161 150 Hybrid Active
J3033 Not reported 345 75 Battery Withdrawn
J1703 Not reported 161 74 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.