Walker, TX interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
150active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2851 Not reported n/r 250 Solar Withdrawn
J3768 Not reported n/r 250 Solar Withdrawn
J3821 Not reported n/r 175 Hybrid Withdrawn
J1671 Not reported 230 150 Solar Active
J1159 Not reported 138 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.