Stutsman, ND interconnection queue
6 active projects totaling 746 MW in the MISO queue, plus 6 with terminal status (shown grayed).
6active projects
746active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G276 | Not reported | n/r | 300 | Other | Withdrawn |
| J031 | Not reported | 345 | 250 | Wind | Withdrawn |
| J1990 | Not reported | 345 | 250 | Wind | Withdrawn |
| J3787 | Not reported | 345 | 247 | Solar | Active |
| J013 | Not reported | 115 | 200 | Wind | Withdrawn |
| J2250 | Not reported | n/r | 200 | Wind | Active |
| J2344 | Not reported | 345 | 200 | Wind | Withdrawn |
| J262 | Not reported | 115 | 100 | Wind | Operational |
| J263 | Not reported | 115 | 100 | Wind | Operational |
| J613 | Not reported | 115 | 100 | Wind | Withdrawn |
| G645 | Not reported | 115 | 50 | Coal | Operational |
| G788 | Not reported | 115 | 49 | Coal | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.