Stearns, MN interconnection queue

3 active projects totaling 79 MW in the MISO queue, plus 7 with terminal status (shown grayed).

3active projects
79active MW
10total filed
Queue IDProjectkVMWResourceStatus
J4162 Not reported 345 300 Battery Withdrawn
J017 Not reported 115 200 Wind Withdrawn
J014 Not reported 115 100 Wind Withdrawn
H048 Not reported 69 50 Wind Withdrawn
J771 Not reported 69 50 Solar Withdrawn
H049 Not reported 69 45 Wind Withdrawn
H058 Not reported 69 45 Wind Withdrawn
H071 Not reported 69 40 Wind Operational
G858 Not reported 69 38 Wind Operational
J258 Not reported 69 1 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.