Substation Scout

Scott, MS interconnection queue

2 active projects totaling 275 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
275active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3680 Not reported n/r 189 Hybrid Withdrawn
J1347 Not reported 115 175 Solar Operational
J4131 Not reported 115 100 Battery Active
J3714 Not reported 69 95 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first