Substation Scout

Renville, MN interconnection queue

2 active projects totaling 325 MW in the MISO queue, plus 10 with terminal status (shown grayed).

2active projects
325active MW
12total filed
Queue IDProjectkVMWResourceStatus
J3259 Not reported n/r 250 Battery Withdrawn
J1846 Not reported n/r 200 Hybrid Active
J2087 Not reported n/r 125 Solar Active
J556 Not reported 230 102 Wind Withdrawn
J1568 Not reported 115 100 Solar Withdrawn
J770 Not reported 69 90 Solar Withdrawn
H070 Not reported 69 85 Wind Withdrawn
J1645 Not reported 230 80 Solar Withdrawn
H065 Not reported 69 40 Wind Withdrawn
J322 Not reported 69 40 Solar Withdrawn
J784 Not reported n/r 40 Solar Withdrawn
J769 Not reported 69 33 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.