Renville, MN interconnection queue
2 active projects totaling 325 MW in the MISO queue, plus 10 with terminal status (shown grayed).
2active projects
325active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3259 | Not reported | n/r | 250 | Battery | Withdrawn |
| J1846 | Not reported | n/r | 200 | Hybrid | Active |
| J2087 | Not reported | n/r | 125 | Solar | Active |
| J556 | Not reported | 230 | 102 | Wind | Withdrawn |
| J1568 | Not reported | 115 | 100 | Solar | Withdrawn |
| J770 | Not reported | 69 | 90 | Solar | Withdrawn |
| H070 | Not reported | 69 | 85 | Wind | Withdrawn |
| J1645 | Not reported | 230 | 80 | Solar | Withdrawn |
| H065 | Not reported | 69 | 40 | Wind | Withdrawn |
| J322 | Not reported | 69 | 40 | Solar | Withdrawn |
| J784 | Not reported | n/r | 40 | Solar | Withdrawn |
| J769 | Not reported | 69 | 33 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.