Substation Scout

Poweshiek, IA interconnection queue

3 active projects totaling 510 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3active projects
510active MW
5total filed
Queue IDProjectkVMWResourceStatus
R51 Not reported 345 250.5 Wind Withdrawn
J475 Not reported 345 200 Wind Operational
J272 Not reported 161 170.2 Wind Withdrawn
J438 Not reported 161 170 Wind Operational
J555 Not reported 345 140 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first