Posey, IN interconnection queue
3 active projects totaling 750 MW in the MISO queue, plus 11 with terminal status (shown grayed).
3active projects
750active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J708 | Not reported | 138 | 847 | Gas | Withdrawn |
| J1308 | Not reported | 345 | 300 | Solar | Active |
| J3424 | Not reported | 345 | 300 | Battery | Withdrawn |
| G053 | Not reported | n/r | 260 | Gas | Withdrawn |
| J2970 | Not reported | 345 | 250 | Solar | Active |
| J3248 | Not reported | 138 | 250 | Battery | Withdrawn |
| J3414 | Not reported | 345 | 200 | Solar | Withdrawn |
| J3948 | Not reported | 345 | 200 | Battery | Active |
| J1274 | Not reported | 69 | 100 | Hybrid | Withdrawn |
| J1276 | Not reported | 69 | 100 | Hybrid | Withdrawn |
| J332 | Not reported | n/r | 90 | Gas | Withdrawn |
| J1148 | Not reported | 138 | 54 | Gas | Withdrawn |
| J3491 | Not reported | 345 | 45 | Solar | Withdrawn |
| J3492 | Not reported | 345 | 45 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.