Orleans Parish, LA interconnection queue
2 active projects totaling 174.8 MW in the MISO queue, plus 3 with terminal status (shown grayed).
2active projects
174.8active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J402 | Not reported | n/r | 991 | Gas | Withdrawn |
| J481 | Not reported | n/r | 134.8 | Gas | Operational |
| J2457 | Not reported | n/r | 40 | Battery | Active |
| J687 | Not reported | 115 | 20 | Solar | Withdrawn |
| J862 | Not reported | 115 | 20 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.