New Madrid, MO interconnection queue
3 active projects totaling 550 MW in the MISO queue, plus 1 with terminal status (shown grayed).
3active projects
550active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J944 | Not reported | 161 | 200 | Solar | Operational |
| S1117 | Surplus; J944 | 161 | 200 | Battery | Active |
| J2155 | Not reported | n/r | 150 | Solar | Active |
| J2718 | Not reported | n/r | 50 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.