Substation Scout

New Madrid, MO interconnection queue

3 active projects totaling 550 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3active projects
550active MW
4total filed
Queue IDProjectkVMWResourceStatus
J944 Not reported 161 200 Solar Operational
S1117 Surplus; J944 161 200 Battery Active
J2155 Not reported n/r 150 Solar Active
J2718 Not reported n/r 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.