Substation Scout

Missaukee, MI interconnection queue

3 active projects totaling 66 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3active projects
66active MW
4total filed
Queue IDProjectkVMWResourceStatus
G742 Not reported 138 120 Wind Withdrawn
G743 Not reported 69 45 Wind Operational
G566d Not reported 69 18 Wind Operational
G566 Not reported 69 3 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first