Mahoning, OH interconnection queue

1 active project totaling 5 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
5active MW
2total filed
Queue IDProjectkVMWResourceStatus
H093 Not reported 69 5 Other Operational
J172 Not reported 69 3.2 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first