Substation Scout

Madison, IL interconnection queue

2 active projects totaling 359 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
359active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3751 Not reported 345 236 Wind Withdrawn
J3727 Not reported n/r 225 Battery Active
G478 Not reported n/r 134 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first