Liberty, TX interconnection queue

7 active projects totaling 1,250 MW in the MISO queue, plus 10 with terminal status (shown grayed).

7active projects
1,250active MW
17total filed
Queue IDProjectkVMWResourceStatus
J3605 Not reported n/r 465 Gas Withdrawn
J3986 Not reported 230 270 Solar Active
J1760 Not reported 230 205 Solar Active
J2075 Not reported n/r 200 Solar Active
J2767 Not reported 138 200 Solar Withdrawn
J3972 Not reported 230 200 Wind Withdrawn
J2689 Not reported 230 180 Hybrid Active
J2314 Not reported n/r 150 Solar Active
J2165 Not reported 230 145 Solar Active
J1277 Not reported 138 130 Solar Withdrawn
J2817 Not reported 230 120 Solar Withdrawn
J915 Not reported 138 100 Solar Withdrawn
J932 Not reported 230 100 Solar Withdrawn
J483 Not reported 138 100 Solar Active
J1168 Not reported 138 80 Solar Withdrawn
J917 Not reported 138 78 Solar Withdrawn
J2315 Not reported n/r 75.3 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.