Laporte, IN interconnection queue
7 active projects totaling 853 MW in the MISO queue, plus 4 with terminal status (shown grayed).
7active projects
853active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3215 | Not reported | 345 | 594 | Gas | Withdrawn |
| J1355 | Not reported | 138 | 160 | Battery | Active |
| J011 | Not reported | 345 | 150 | Wind | Withdrawn |
| J1724 | Not reported | 138 | 150 | Solar | Active |
| J3225 | Not reported | 345 | 150 | Hybrid | Withdrawn |
| J3679 | Not reported | 345 | 149 | Solar | Active |
| J1358 | Not reported | 138 | 125 | Battery | Active |
| J2187 | Not reported | 138 | 124 | Solar | Active |
| J1785 | Not reported | 69 | 100 | Solar | Active |
| J3334 | Not reported | n/r | 100 | Battery | Withdrawn |
| J1861 | Not reported | 138 | 45 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.