Laporte, IN interconnection queue

7 active projects totaling 853 MW in the MISO queue, plus 4 with terminal status (shown grayed).

7active projects
853active MW
11total filed
Queue IDProjectkVMWResourceStatus
J3215 Not reported 345 594 Gas Withdrawn
J1355 Not reported 138 160 Battery Active
J011 Not reported 345 150 Wind Withdrawn
J1724 Not reported 138 150 Solar Active
J3225 Not reported 345 150 Hybrid Withdrawn
J3679 Not reported 345 149 Solar Active
J1358 Not reported 138 125 Battery Active
J2187 Not reported 138 124 Solar Active
J1785 Not reported 69 100 Solar Active
J3334 Not reported n/r 100 Battery Withdrawn
J1861 Not reported 138 45 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.