Substation Scout

Kossuth, IA interconnection queue

2 active projects totaling 275 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
275active MW
3total filed
Queue IDProjectkVMWResourceStatus
H077 Not reported 161 250 Wind Withdrawn
J836 Not reported 345 200 Wind Operational
S1109 Surplus; J495 n/r 75 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first