Substation Scout

Jefferson, TX interconnection queue

2 active projects totaling 1,108.5 MW in the MISO queue, plus 12 with terminal status (shown grayed).

2active projects
1,108.5active MW
14total filed
Queue IDProjectkVMWResourceStatus
E0030 Not reported 230 820 Gas Active
J3708 Not reported n/r 770 Gas Withdrawn
J2168 Not reported n/r 693 Solar Withdrawn
J3262 Not reported n/r 300 Wind Withdrawn
J3902 Not reported n/r 288.5 Wind Active
J2041 Not reported n/r 200 Hybrid Withdrawn
J3299 Not reported n/r 150 Battery Withdrawn
J1120 Not reported 138 145 Wind Withdrawn
J3587 Not reported n/r 110 Gas Withdrawn
J429 Not reported 138 100 Wind Withdrawn
J517 Not reported n/r 100 Solar Withdrawn
J1162 Not reported 230 80 Solar Withdrawn
J428 Not reported 138 50 Solar Withdrawn
J2975 Not reported 230 44.1 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first