Substation Scout

Iroquois, IL interconnection queue

9 active projects totaling 1,927.9 MW in the MISO queue, plus 4 with terminal status (shown grayed).

9active projects
1,927.9active MW
13total filed
Queue IDProjectkVMWResourceStatus
J3015 Not reported 138 400 Hybrid Active
J3853 Not reported n/r 300 Wind Active
J2565 Not reported 138 265 Solar Active
J3867 Not reported n/r 200 Solar Withdrawn
J3753 Not reported n/r 195.6 Wind Active
J2136 Not reported n/r 190.9 Solar Active
G931 Not reported 138 150 Wind Operational
J276 Not reported n/r 150 Hybrid Withdrawn
J277 Not reported n/r 150 Wind Withdrawn
J3754 Not reported n/r 146.7 Wind Active
J3755 Not reported n/r 146.7 Wind Active
J2809 Not reported 138 133 Solar Active
G537 Not reported 138 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first