Ingham, MI interconnection queue

3 active projects totaling 415 MW in the MISO queue, plus 8 with terminal status (shown grayed).

3active projects
415active MW
11total filed
Queue IDProjectkVMWResourceStatus
J1666 Not reported 345 300 Wind Withdrawn
J3838 Not reported 138 225 Solar Active
J1919 Not reported 345 132 Solar Withdrawn
J1608 Not reported 138 100 Solar Withdrawn
J2555 Not reported 138 100 Battery Active
J2807 Not reported 138 100 Solar Withdrawn
J1090 Not reported 138 90 Solar Withdrawn
J1399 Not reported 138 90 Solar Active
J1117 Not reported 138 80 Solar Withdrawn
G226.1 Not reported n/r 60 Other Withdrawn
G227 Not reported n/r 24 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.