Hancock, IA interconnection queue

4 active projects totaling 496 MW in the MISO queue, plus 12 with terminal status (shown grayed).

4active projects
496active MW
16total filed
Queue IDProjectkVMWResourceStatus
J116 Not reported 345 999 Wind Withdrawn
J501 Not reported 345 500 Wind Withdrawn
J130 Not reported n/r 300 Gas Withdrawn
R68 Not reported 345 249.6 Wind Withdrawn
G735 Not reported n/r 200 Wind Operational
G595 Not reported 161 150 Wind Operational
J2079 Not reported 161 150 Wind Withdrawn
G056 Not reported n/r 80 Wind Operational
J091 Not reported 161 66 Wind Operational
J1729 Not reported 161 43 Wind Withdrawn
J1767 Not reported 161 37 Wind Withdrawn
J1727 Not reported 161 33.8 Wind Withdrawn
J049 Not reported n/r 16 Wind Withdrawn
J767 Not reported 161 12 Wind Withdrawn
J763 Not reported n/r 5.3 Wind Withdrawn
G534 Not reported n/r 4.9 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first