Faulkner, AR interconnection queue

2 active projects totaling 290 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
290active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2449 Not reported 500 200 Battery Withdrawn
J4030 Not reported 115 200 Battery Active
J3099 Not reported 161 100 Solar Withdrawn
J3953 Not reported 161 90 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.