Edgar, IL interconnection queue
5 active projects totaling 916.2 MW in the MISO queue, plus 6 with terminal status (shown grayed).
5active projects
916.2active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G649 | Not reported | n/r | 300 | Wind | Withdrawn |
| J1675 | Not reported | 345 | 250 | Wind | Withdrawn |
| J2587 | Not reported | 345 | 200 | Battery | Active |
| J4002 | Not reported | 345 | 200 | Battery | Active |
| J4003 | Not reported | 345 | 200 | Solar | Active |
| J2266 | Not reported | 345 | 175 | Hybrid | Active |
| J3797 | Not reported | 345 | 141.2 | Solar | Active |
| G648 | Not reported | n/r | 101 | Wind | Withdrawn |
| G979 | Not reported | 345 | 100 | Wind | Withdrawn |
| J044 | Not reported | 138 | 99 | Wind | Withdrawn |
| J2278 | Not reported | n/r | 60 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.