Substation Scout

Edgar, IL interconnection queue

5 active projects totaling 916.2 MW in the MISO queue, plus 6 with terminal status (shown grayed).

5active projects
916.2active MW
11total filed
Queue IDProjectkVMWResourceStatus
G649 Not reported n/r 300 Wind Withdrawn
J1675 Not reported 345 250 Wind Withdrawn
J2587 Not reported 345 200 Battery Active
J4002 Not reported 345 200 Battery Active
J4003 Not reported 345 200 Solar Active
J2266 Not reported 345 175 Hybrid Active
J3797 Not reported 345 141.2 Solar Active
G648 Not reported n/r 101 Wind Withdrawn
G979 Not reported 345 100 Wind Withdrawn
J044 Not reported 138 99 Wind Withdrawn
J2278 Not reported n/r 60 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.