Substation Scout

Douglas, WI interconnection queue

1 active project totaling 561.5 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
561.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
J560 Not reported n/r 835 Gas Withdrawn
J732 Not reported 345 561.5 Gas Active
G117 Not reported 115 324 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first