Douglas, IL interconnection queue

1 active project totaling 202 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
202active MW
4total filed
Queue IDProjectkVMWResourceStatus
J468 Not reported 345 202 Wind Operational
J467 Not reported 345 102 Wind Withdrawn
G978 Not reported 138 100 Wind Withdrawn
H006 Not reported 345 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first