Des Moines, IA interconnection queue
2 active projects totaling 262 MW in the MISO queue, plus 8 with terminal status (shown grayed).
2active projects
262active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G127 | Not reported | n/r | 600 | Other | Withdrawn |
| G126 | Not reported | n/r | 325 | Other | Withdrawn |
| R1019 | Replacing 30 MW of existing coal generation with BESS at Burlington Generation Station; Burlington 5 | 161 | 212 | Hybrid | Active |
| J097 | Not reported | 161 | 200 | Wind | Withdrawn |
| J1972 | Not reported | n/r | 115 | Solar | Withdrawn |
| J1479 | Not reported | 161 | 100 | Battery | Withdrawn |
| J1135 | Not reported | 69 | 50 | Solar | Active |
| J1853 | Not reported | n/r | 50 | Battery | Withdrawn |
| R1043 | Replacing 31 MW of generation with linear generators powered by natural gas; Burlington 3 | 161 | 31 | Hybrid | Withdrawn |
| J1478 | Not reported | 69 | 25 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.