Des Moines, IA interconnection queue

2 active projects totaling 262 MW in the MISO queue, plus 8 with terminal status (shown grayed).

2active projects
262active MW
10total filed
Queue IDProjectkVMWResourceStatus
G127 Not reported n/r 600 Other Withdrawn
G126 Not reported n/r 325 Other Withdrawn
R1019 Replacing 30 MW of existing coal generation with BESS at Burlington Generation Station; Burlington 5 161 212 Hybrid Active
J097 Not reported 161 200 Wind Withdrawn
J1972 Not reported n/r 115 Solar Withdrawn
J1479 Not reported 161 100 Battery Withdrawn
J1135 Not reported 69 50 Solar Active
J1853 Not reported n/r 50 Battery Withdrawn
R1043 Replacing 31 MW of generation with linear generators powered by natural gas; Burlington 3 161 31 Hybrid Withdrawn
J1478 Not reported 69 25 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.