Substation Scout

Delta, MI interconnection queue

6 active projects totaling 316.3 MW in the MISO queue, plus 7 with terminal status (shown grayed).

6active projects
316.3active MW
13total filed
Queue IDProjectkVMWResourceStatus
G937 Not reported 138 200 Wind Withdrawn
G567 Not reported 138 165 Coal Withdrawn
J2678 Not reported 138 150 Solar Active
G568 Not reported n/r 135 Coal Withdrawn
J849 Not reported 138 125 Solar Withdrawn
J928 Not reported 138 80 Wind Operational
J061 Not reported n/r 70 Wind Withdrawn
S1015 Surplus; J928 138 55 Hybrid Active
J039 Not reported 69 50 Other Withdrawn
J592 Not reported 138 48.3 Wind Withdrawn
J060 Not reported n/r 29 Wind Operational
J1183 Not reported n/r 1.4 Solar Operational
J557 Not reported 138 0.9 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first