Covington, MS interconnection queue

1 active project totaling 96 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
96active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2971 Not reported 161 280 Solar Withdrawn
J4107 Not reported 161 150 Battery Withdrawn
J1144 Not reported 161 96 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.