Concordia Parish, LA interconnection queue

2 active projects totaling 237.2 MW in the MISO queue, plus 10 with terminal status (shown grayed).

2active projects
237.2active MW
12total filed
Queue IDProjectkVMWResourceStatus
J1953 Not reported 115 264.6 Solar Withdrawn
J2228 Not reported n/r 200 Solar Active
J2792 Not reported 115 150 Solar Withdrawn
J2904 Not reported n/r 150 Hybrid Withdrawn
J2479 Not reported 115 140 Battery Withdrawn
J3046 Not reported 115 140 Battery Withdrawn
J565 Not reported n/r 101.8 Solar Withdrawn
J3272 Not reported n/r 85 Solar Withdrawn
J2430 Not reported 115 80 Solar Withdrawn
J551 Not reported n/r 49.8 Solar Withdrawn
J868 Not reported 115 37.2 Other Active
J635 Not reported 115 35 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.