Clinton, MI interconnection queue

2 active projects totaling 450 MW in the MISO queue, plus 6 with terminal status (shown grayed).

2active projects
450active MW
8total filed
Queue IDProjectkVMWResourceStatus
J4195 Not reported 345 300 Wind Active
J2674 Not reported 138 200 Solar Withdrawn
J1553 Not reported n/r 150 Solar Active
J1589 Not reported 138 150 Solar Withdrawn
J3203 Not reported 138 150 Solar Withdrawn
J2710 Not reported 69 100 Solar Withdrawn
J070 Not reported 138 49.2 Wind Withdrawn
J1862 Not reported 138 45 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.