Clay, MN interconnection queue
4 active projects totaling 922 MW in the MISO queue, plus 7 with terminal status (shown grayed).
4active projects
922active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G859 | Not reported | 345 | 600 | Wind | Withdrawn |
| J3762 | Not reported | 345 | 430 | Solar | Active |
| J4147 | Not reported | 345 | 245 | Solar | Active |
| J4148 | Not reported | 345 | 245 | Solar | Active |
| G821 | Not reported | 230 | 199.5 | Wind | Withdrawn |
| H099 | Not reported | 230 | 150 | Wind | Withdrawn |
| J001 | Not reported | 230 | 150 | Wind | Withdrawn |
| J2067 | Not reported | n/r | 39.4 | Wind | Withdrawn |
| G414 | Not reported | n/r | 10 | Wind | Withdrawn |
| G846 | Not reported | 41.6 | 4 | Wind | Withdrawn |
| G006 | Not reported | n/r | 2 | Wind | Active |