Churchill, MB interconnection queue
1 active project totaling 3,576 MW in the MISO queue.
1active projects
3,576active MW
1total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J292 | Not reported | n/r | 3,576 | Hydro | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner