Substation Scout

Cherokee, IA interconnection queue

1 active project totaling 160.3 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
160.3active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2757 Not reported 161 160.3 Solar Active
J3325 Not reported 161 140 Wind Withdrawn
R47 Not reported 345 100 Wind Withdrawn
R48 Not reported 345 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first