Cass, IN interconnection queue

3 active projects totaling 404 MW in the MISO queue, plus 4 with terminal status (shown grayed).

3active projects
404active MW
7total filed
Queue IDProjectkVMWResourceStatus
J1741 Not reported 345 270 Solar Withdrawn
J992 Not reported 230 200 Solar Active
S1102 Surplus; J992 n/r 200 Battery Active
J3016 Not reported n/r 150 Hybrid Withdrawn
J1680 Not reported 345 100 Solar Withdrawn
J1692 Not reported 345 65 Battery Withdrawn
G299 Not reported n/r 4 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.