Substation Scout

Carroll, IA interconnection queue

2 active projects totaling 250 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
250active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3477 Not reported n/r 200 Solar Active
R57 Not reported 161 100 Wind Withdrawn
R64 Not reported n/r 70 Wind Withdrawn
J1529 Not reported 69 50 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.