Substation Scout

Beaver, PA interconnection queue

2 active projects totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
100active MW
3total filed
Queue IDProjectkVMWResourceStatus
G541 Not reported n/r 50 Coal Operational
G542 Not reported n/r 50 Coal Withdrawn
G543 Not reported n/r 50 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first