2 active projects totaling 650 MW in the MISO queue, plus 8 with terminal status (shown grayed).

2active projects
650active MW
10total filed
Queue IDProjectkVMWResourceStatus
J1026 Not reported 345 400 Wind Active
J3929 Not reported n/r 250 Wind Active
J1123 Not reported 345 150 Wind Withdrawn
J1338 Not reported 345 150 Wind Withdrawn
J1363 Not reported 345 150 Solar Withdrawn
J1240 Not reported 345 135 Solar Withdrawn
J658 Not reported 345 100.1 Wind Withdrawn
G847 Not reported 345 62 Gas Withdrawn
J3190 Not reported 161 50 Solar Withdrawn
J2981 Not reported 69 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.