Substation Scout

Atchison, MO interconnection queue

2 active projects totaling 646 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
646active MW
4total filed
Queue IDProjectkVMWResourceStatus
R26 Not reported 345 400 Wind Operational
J476 Not reported 345 246 Wind Active
J570 Not reported 345 150 Wind Withdrawn
J113 Not reported 345 100.5 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first