Adams, IA interconnection queue
1 active project totaling 150 MW in the MISO queue, plus 3 with terminal status (shown grayed).
1active projects
150active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1533 | Not reported | 161 | 200 | Solar | Withdrawn |
| J3305 | Not reported | n/r | 150 | Solar | Withdrawn |
| J343 | Not reported | 161 | 150 | Wind | Operational |
| R66 | Not reported | 161 | 150 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.