Substation Scout

LG&E and KU request LGE-GIS-2021-017

LG&E and KU queue ID LGE-GIS-2021-017

Queue request LGE-GIS-2021-017 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 100 MW hybrid project in Mason County, KY, according to Berkeley Lab’s queue data file. The filing names Wedonia - Kenton line as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of December 31, 2026.

Queue IDLGE-GIS-2021-017
Project nameNot reported
Status (as published)Suspended
SubstationWedonia - Kenton line
Point of interconnectionWedonia - Kenton 138 kV line
CountyMason
StateKY
Voltage138 kV
Capacity100 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mason, KY: 2 requests in the LG&E and KU queue, 1 active totaling 100 MW.

Tracked changes

Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityLouisville Gas & Electric and Kentucky Utilities Energy
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Suspended
Study phase (as the queue printed it)LGIA signed, currently suspended
Queue date2021-04-27
Components (hybrid)Solar 100 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first