1 active project totaling 100 MW in the LG&E and KU queue, plus 1 with terminal status (shown grayed).

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2021-017 Not reported 138 100 Hybrid Suspended
LGE-GIS-2019-026 Not reported 138 60 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.