LG&E and KU request LGE-GIS-2021-009
LG&E and KU queue ID LGE-GIS-2021-009
Queue request LGE-GIS-2021-009 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 200 MW hybrid project in Hardin County, KY, according to Berkeley Lab’s queue data file. The filing names Primary: Hardin County bus; Alternate: Hardin County ‚Äì Daviess County line, SIS Primary changed to: Hardin County ‚Äì Daviess County line as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of June 15, 2026.
| Queue ID | LGE-GIS-2021-009 |
|---|---|
| Project name | Not reported |
| Status (as published) | Suspended |
| Substation | Primary: Hardin County bus; Alternate: Hardin County – Daviess County line, SIS Primary changed to: Hardin County – Daviess County line |
| Point of interconnection | Primary: Hardin County 345 kV bus; Alternate: Hardin County – Daviess County 345 kV line, SIS Primary changed to: Hardin County – Daviess County 345 kV line |
| County | Hardin |
| State | KY |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2026-06-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Hardin, KY: 4 requests in the LG&E and KU queue, 2 active totaling 320 MW.
Tracked changes
Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Louisville Gas & Electric and Kentucky Utilities Energy |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Suspended |
| Study phase (as the queue printed it) | LGIA signed, currently suspended |
| Queue date | 2021-03-22 |
| Components (hybrid) | Solar 200 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.