Hardin, KY interconnection queue

2 active projects totaling 320 MW in the LG&E and KU queue, plus 2 with terminal status (shown grayed).

2active projects
320active MW
4total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2021-009 Not reported 345 200 Hybrid Suspended
LGE-GIS-2021-013 Not reported 69 120 Battery Active
LGE-GIS-2019-029 Not reported 138 100 Solar Withdrawn
LGE-GIS-2019-030 Not reported 69 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.