LG&E and KU request LGE-GIS-2011-005

LG&E and KU queue ID LGE-GIS-2011-005

Queue request LGE-GIS-2011-005 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 6 MW hydro project in Mercer County, KY, according to Berkeley Lab’s queue data file. The filing names Dix Dam Uprate as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 15, 2013.

Queue IDLGE-GIS-2011-005
Project nameNot reported
Status (as published)Active
SubstationDix Dam Uprate
Point of interconnectionDix Dam Uprate
CountyMercer
StateKY
VoltageNot reported
Capacity6 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2013-03-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mercer, KY: 15 requests in the LG&E and KU queue, 6 active totaling 922 MW.

Tracked changes

Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityLouisville Gas & Electric and Kentucky Utilities Energy
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Interim LGIA signed; LGIA signed
Queue date2011-11-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.