Mercer, KY interconnection queue

6 active projects totaling 922 MW in the LG&E and KU queue, plus 9 with terminal status (shown grayed).

6active projects
922active MW
15total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2011-004 Not reported 345 880 Hybrid Withdrawn
LGE-GIS-2022-004 Not reported 345 660 Gas Withdrawn
LGE-GIS-2022-011 Not reported 138 660 Gas Withdrawn
LGE-GIS-2023-002 Not reported 345 660 Gas Active
LGE-GIS-2021-006 Not reported 138 635 Gas Withdrawn
LGE-GIS-2023-001 Not reported 345 125 Battery Withdrawn
LGE-GIS-2023-003 Not reported 345 125 Battery Active
LGE-GIS-2020-002 Not reported 69 105 Solar Withdrawn
LGE-GIS-2019-011 Not reported 138 100 Solar Withdrawn
LGE-GIS-2021-012 Not reported 138 100 Battery Withdrawn
LGE-GIS-2019-025 Not reported 138 99 Solar Active
LGE-GIS-2023-004 Not reported 69 89 Hybrid Withdrawn
LGE-GIS-2024-004 Not reported 138 22 Solar Active
LGE-GIS-2014-001 Not reported 138 10 Solar Active
LGE-GIS-2011-005 Not reported n/r 6 Hydro Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.